- ORDER ADOPTING THE SECOND INCREMENT BASIN-WIDE PLAN (August 9, 2019)
- ORDER OF FINAL DETERMINATION OF RIVER BASINS, SUBBASINS, OR REACHES AS FULLY APPROPRIATED, AND DESCRIBING HYDROLOGICALLY CONNECTED GEOGRAPHIC AREAS (April 21, 2006)
- ORDER OF FINAL DETERMINATION OF RIVER BASINS, SUBBASINS, OR REACHES AS FULLY APPROPRIATED, AND DESCRIBING HYDROLOGICALLY CONNECTED GEOGRAPHIC AREA (September 30, 2004)
- ORDER DESIGNATING OVERAPPROPRIATED RIVER BASINS, SUBBASINS, OR REACHES, AND DESCRIBING HYDROLOGICALLY CONNECTED GEOGRAPHIC AREA (September 15, 2004)
- APPENDIX I: Legal Description of Hydrologically Connected Area
- APPENDIX II: Map of Overappropriated and Hydrologically Connected Area
- ORDER DECLARING FORMAL MORATORIUMS IN THE MATTER OF THE PLATTE RIVER BASIN, THE NORTH PLATTE RIVER BASIN, THE SOUTH PLATTE RIVER BASIN, THE REPUBLICAN RIVER BASIN, THE WHITE RIVER BASIN, AND THE HAT CREEK BASIN (July 14, 2004)